In the picture above can be seen a lift that is used to move workers to the upper levels of the job.
Workers pictured above are stripping the old stucco siding away from the underlying plywood sheathing. The stucco will be replaced with hardi-panel, and rain gutters will be added to prevent rain-water intrusion.